A quality manager reached out. They'd run a measurement system analysis on a surface roughness gauge. The spreadsheet said everything was fine. But was it?
A production manager contacted me. Quality costs were high. A customer with strict requirements was extremely dissatisfied. "We've tried EVERYTHING," he said.